planning and design consultants

Sikhuphe International Airport ICAO Terminal

The Terminal is planned to accommodate significant level changes across the site. The project comprised the design development of appropriate local architecture for the terminal, consistent with modern terminal design and construction methodologies.

The terminal has been open since 2014.

item5
item6